Sunday, 10 March 2013

The upstairs is finished. Premier etage fini

After 4 years of work, the First Floor is finished. I completed the bedroom, bathroom and study last year (the spare bedroom was done 3 years ago) but had left the landing for a suitable point. That point arrived last week when rainy weather caused me to look for a job inside. And here it is. The top rail of the balustrade Ruth got from a second-hand shop and most of the infil is from parts of a cart we found in a junkyard. It was stripped and I assembled it amid much swearing and varnished it. A few carpet tiles and that was that!