Sunday 10 March 2013

Floods

We had two bouts of very heavy rain in February, both leading to flooding alongside the Adour. The river rose 2 or 3 metres and roads were covered in various places. The last picture is taken looking downstream from the main bridge in Labatut. That wasn't when the flooding was at its worst, since, at that time it wasn't possible to get to the bridge. At least not with dry feet. Which reminds me that the rains were another factor in interfering with my road-running training.
 
 




No comments: